35 years experience and customer care, printing since 1992
all our plastic cards are proudly printed in England Proudly printed in England all our plastic cards are proudly printed in England
Tel 01948 664 806 Email: sales@cpcards.co.uk We aim to reply within 10 minutes 9-5 Mon-Fri

Scaffold Tags and Ladder Inspection Tags

Custom printed inspection tags for scaffolding, ladders, harnesses and site equipment — tough waterproof plastic, branded with your company name, and punched ready for cable ties. Manufactured in England by CP Cards since 1992.

If you are paying for generic off-the-shelf tag systems, you are advertising someone else on your own scaffold. Our tags carry your branding, your contact details and your inspection fields, at prices that make sense when you are tagging hundreds of assets.

Built for site conditions

These tags live outdoors, in rain, dust and UV, strapped to a scaffold standard or a ladder stile. Rigid plastic will not tear, go soggy or fade after a month on site. We recommend our premium matt finish for inspection tags — it takes permanent marker cleanly, so inspection dates and initials can be added on site by hand.

Your branding, your fields

We print whatever your inspection process needs:

  • Company name, logo and contact number
  • Inspection date grids or next inspection due fields
  • Unique asset numbers for tracking equipment
  • Scaffold incomplete or do not use warnings on the reverse

Because every tag is custom printed, hire companies can add their hire desk number, and scaffolding firms can turn every tagged scaffold into a small advert.

Asset numbering

We specialise in variable data printing. Each tag can carry a unique sequential asset number, so ladders, harnesses and lifting equipment can be individually identified in your inspection records.

A note on compliance

Tags are a visible record of inspection — they support your inspection regime, they do not replace it. Inspections must still be carried out by a competent person in line with the relevant regulations. What our tags do is make the status of every asset obvious at a glance.

scaffold inspection tag example

How to Order

  1. Tell us your quantity and choose the matt finish for marker compatibility
  2. Send your logo, branding and inspection field requirements
  3. Approve a free digital proof
  4. Tags printed and dispatched in 7 working days from proof approval and payment

Minimum order 25 cards. Standard turnaround 7 working days from proof approval and payment.

What UK law says about scaffold inspections

Under the Work at Height Regulations 2005, scaffolding from which a person could fall two metres or more must be inspected before first use and then at intervals not exceeding seven days, as well as after any alteration, damage or event likely to have affected its strength — such as high winds. The inspection must be carried out by a competent person, and a written report is required. A tag system does not replace that written report, but it puts the scaffold’s current status where everyone can see it: at the access point, before anyone climbs.

A clearly displayed inspection tag tells site workers three things at a glance — when the scaffold was last inspected, who inspected it, and when the next inspection is due. Many principal contractors now expect a visible tag on every standing scaffold as a condition of site access. For further guidance, see the HSE’s work at height pages and the guidance published by the National Access and Scaffolding Confederation (NASC).

Why printed plastic beats laminated paper on site

Site conditions destroy paper. Laminated inserts fade in sunlight, wick water at the edges and tear where the cable tie passes through. A rigid 760-micron PVC tag with print sealed beneath the surface survives rain, UV and repeated handling for the life of the scaffold — and a write-on panel accepts a permanent marker for each new inspection entry. When the job ends, tags come down with the scaffold and a fresh set goes up on the next one.

Content reviewed by the CP Cards team, July 2026.

Trusted by scaffolding and access contractors across the UK

We print inspection tags for scaffolding firms and access contractors across the UK, alongside the ID and certification cards we produce for construction and training businesses. Every order includes a free photorealistic proof before printing, and our design team can set up your artwork if you need a hand.

Inspection Tag FAQs

Can inspection dates be written on the tags?

Yes. We recommend our premium matt finish for inspection tags, as it takes permanent marker better than our high gloss finish, so inspection dates and initials can be added on site.

Are the tags weatherproof?

Yes. They are rigid waterproof plastic and are made to survive outdoor site conditions, including rain and sunlight, without tearing or fading.

Can each tag have a unique asset number?

Yes. We print sequential or custom asset numbers on every tag, so individual ladders, harnesses and equipment can be tracked in your inspection records.

How do the tags attach to scaffolding and ladders?

Each tag has a punched hole, 5mm in diameter and positioned anywhere around the edge, ready for a cable tie. Cable ties themselves are not supplied.

Can we have our own company branding instead of a generic tag?

Yes. That is the point. Every tag is custom printed with your logo, colours and contact details, so your scaffolding carries your name rather than a generic tag brand.